Context
Recently, the third unit of the indigenously developed 700-megawatt electric (MWe) nuclear power reactor at the Kakrapar Atomic Power Project (KAPP3) in Tapi district of Gujarat has commenced operations at full capacity.
Background
| 
 Before the inauguration of KAPP, the biggest reactor of indigenous design was the 540 MWe PHWR, two of which have been deployed in Tarapur, Maharashtra.  | 
About
| 
 Currently, KAPP3 nuclear power capacity constitutes around 2 per cent of the total installed capacity of 4,17,668 MW.  | 
| 
 Nuclear Power Corporation of India Limited: 
  | 
Verifying, please be patient.